AS 4747.4:2025 PDF
AS 4747.4:2025 sets out the installation and commissioning requirements for non-urban metering systems in closed conduit, fully charged applications, and in open channel and partially filled conduit applications.
$89.00 $44.00
Metering systems for non-urban water supply, Part 4: Installation and commissioning of metering systems
standard by Standards Australia , 06/27/2025
AS 4747.4:2025 PDF
AS 4747.4:2025 sets out the installation and commissioning requirements for non-urban metering systems in closed conduit, fully charged applications, and in open channel and partially filled conduit applications.